The schedule, handed back

An auditor for MS Project schedules: a health score, earned value, Monte Carlo dates, revision diffs, and a diagnosis. The book says the files are not stored.

What it does

MS Project schedule auditor for construction planners: health score, S-curve/EV, Monte Carlo dates, revision diffs, AI diagnosis — files never stored.

Why it’s interesting

An MS Project file is audited for a health score, an S-curve, Monte Carlo dates, revision diffs, and a diagnosis, and the file itself is not stored. On the Y Combinator list the category is a new operating system for the physical world. Oracle Primavera and the P6 consultants own the planner relationship, and what has to happen is a free-to-paid conversion with general-contractor and subcontractor planners.

The file goes in. A forecast comes back.

The hard part

Oracle Primavera and P6 consultants own planner relationships; must prove free-to-paid conversion with GC/sub planners.

Which desks it fits

  1. Y Combinator

    Ask New Operating Systems for the Physical World

    YC Fall 2026 Physical-world OS: lightweight schedule OS for construction crews — risk, float, and forecast without a Primavera install.

  2. a16z

    Ask American Dynamism / industrial apps

    American Dynamism industrial software: makes construction schedules auditable and forecastable for real builds, not another generic AI chat.

  3. Antler

    Ask Domain / cannot vibe-code

    Construction CPM, float, and earned-value rules are domain-hard; not a vibe-coded chatbot — credibility comes from planner-grade indicators.

  4. Sequoia

    Ask Applied AI that owns the workflow

    Owns schedule QA for construction: upload MPP, get health/Monte Carlo/AI diagnosis and crew target sheets — the planner's weekly ritual.

  5. Accel

    Ask Application layer

    Application-layer vertical on MS Project files — diagnostics and forecasts without building a foundation model.

  6. Lightspeed

    Ask Agent-first, finished work in messy industries

    Construction is a messy industry; finished work is a crew-ready target sheet and a dated forecast — not a chat summary of the Gantt.

Illustrative bands

Illustrative, not a valuation

Seed
$8–15M
Series A
$40–100M
Outcome
$0.6–2.5BIllustrative, not a valuation

Desks in the book print different illustrative bands for this company. The figures here are taken from the earliest entry that still reads as a money band.

Likely acquirers

Named in the book.

Autodesk, Procore, Oracle Construction, or Trimble buy AI schedule health as a module on field OS.